2018 BMW M6 in Randolph, NJ - $41,544

0 Reviews

I'm interested
Message Successfully Sent!
Dealer
Hello,
I would like to learn more about the 2018 BMW M6 that you have in your inventory. Please contact me as soon as you can.
Thank you.
By using this feature, you agree to EveryCarListed.com’s Terms of Use.
Seller's Comments
Priced below KBB Fair Purchase Price! Singapore Gray Metallic 2018 BMW M6 Gran Coupe RWD 7-Speed Automatic 4.4L V8 32V DOHC TwinPower Turbo
Vehicle Highlights
Price
$41,544
Mileage
44,579
Color
Gray
Condition
Used
Drivetrain
RWD
Engine
8 CYL.
Transmission
7-Speed Automatic
Fuel
VIN
WBS6E9C5XJG808316
Stock Number
SP18633
Location
US, NJ
Features
4-Wheel Disc Brakes
16 Speakers
ABS brakes
AM/FM radio: SiriusXM
Active Blind Spot Detection
Active Driving Assistant
Active Front Seats
Air Conditioning
Alloy wheels
Anti-whiplash front head restraints
Apple CarPlay Compatibility
Auto-dimming Rear-View mirror
Auto-dimming door mirrors
Auto High-beam Headlights
Automatic temperature control
Auto tilt-away steering wheel
Bang & Olufsen Sound System
Brake assist
Bumpers: body-color
CD player
Competition Package
Competition Package (7MA)
DVD-Audio
Delay-off headlights
Door auto-latch
Driver door bin
Driver vanity mirror
Driving Assistance Package
Dual front impact airbags
Dual front side impact airbags
Electronic Stability Control
Emergency communication system: BMW Assist eCall
Enhanced USB & Bluetooth
Executive Package
Extended Merino Leather Seat Upholstery
Exterior Parking Camera Rear
Four wheel independent suspension
Front Bucket Seats
Front Center Armrest
Front Heated Sport Seats
Front Ventilated Seats
Front anti-roll bar
Front beverage holders
Front dual zone A/C
Front reading lights
Fully automatic headlights
Garage door transmitter
Head-Up Display
Headlight cleaning
Head restraints memory
Heated Rear Seats
Heated Steering Wheel
Heated door mirrors
Heated front seats
Illuminated entry
Knee airbag
Leather Shift Knob
Leather steering wheel
Low tire pressure warning
Memory seat
Multi-Function Seats w/Lumbar Support
Navigation System
Occupant sensing airbag
Outside temperature display
Overhead airbag
Panic alarm
Passenger door bin
Passenger vanity mirror
Power Rear Sunshade
Power adjustable front head restraints
Power door mirrors
Power driver seat
Power passenger seat
Power steering
Power windows
Radio: HD
Radio data system
Rain sensing wipers
Rear Side Window Shades
Rear air conditioning
Rear anti-roll bar
Rear dual zone A/C
Rear fog lights
Rear reading lights
Rear seat center armrest
Rear window defroster
Remote keyless entry
Security system
SiriusXM Sat. Radio w/1 Yr All Access Subscription
Speed-Sensitive Wipers
Speed-sensing steering
Speed Limit Info
Speed control
Split folding rear seat
Sport Exhaust w/Black Chrome Tailpipes
Sport steering wheel
Steering wheel memory
Steering wheel mounted audio controls
Tachometer
Telescoping steering wheel
Tilt steering wheel
Traction control
Trip computer
Variably intermittent wipers
Weather band radio
Wheels: 20 x 9.5 Fr & 20 x 10.5 Rr M Alloy
Wheels: 20 x 9.5 Fr & 20 x 10.5 Rr M Lt Alloy
harman/kardon Surround Sound System
harman/kardon� Speakers
Vehicle data is subject to change without notice. The publisher assumes no responsibility for errors and/or omissions in the data and reserves the right to cancel, to terminate or not to process orders where the price or other material information on this site is inaccurate.
Consumer Reviews for the 2018 BMW M6

No reviews found. Be the first to submit a review!

Dealer Information

Dealer

Randolph, NJ 07869

 
Reviews for This Dealer

No reviews found. Be the first to submit a review!

About Us  |    Contact Us  |    Terms of Use  |    Privacy Policy  |    Auto Dealer Marketing  |    Site Map

©2026, EveryCarListed.com, LLC All rights reserved.