2026 BMW M3 in Verona, NJ - $93,900

0 Reviews

I'm interested
Message Successfully Sent!
Dealer
Hello,
I would like to learn more about the 2026 BMW M3 that you have in your inventory. Please contact me as soon as you can.
Thank you.
By using this feature, you agree to EveryCarListed.com’s Terms of Use.
Seller's Comments
Thank you for considering DeCozen Chrysler Jeep Dodge Ram, for your next vehicle. Our Dealership has been in business for over 85 years, we pride ourselves by offering the highest quality of new and pre-owned vehicles. All of our pre-owned vehicles are priced below market value, giving you the best deal possible. Most of our pre-owned vehicles go through a rigorous inspection by our factory trained ASE Certified technicians. We also offer extended warranties on a majority of our pre-owned vehicle inventory. Our Finance Department works with a variety of A rated banks to provide our customers with the lowest and most aggressive rates and terms. Even if your credit is less than perfect! We would love to invite you to visit our 50 car climate controlled showroom. So please make an appointment today or just stop in so we could serve you further. Thank you, Your Friends at DeCozen
Vehicle Highlights
Price
$93,900
Mileage
2,316
Color
Blue
Condition
Used
Drivetrain
AWD
Engine
6 CYL.
Transmission
Automatic
Fuel
VIN
WBS33HJ04TFV82048
Stock Number
5996P
Location
US, NJ
Features
ABS Brakes (4-Wheel)
Active parking system driver controlled brake gas and gear selection
Adjustable Rear Headrests
Adjustable Rear Headrests Foldable
Air Conditioning - Front - Automatic Climate Control
Air Conditioning - Front - Dual Zones
Air Conditioning - Rear - Automatic Climate Control
Air Conditioning - Rear - Single Zone
Air Conditioning - Rear - With Independent Controls
Air Conditioning Air Filtration: Active Charcoal
Airbags - Front - Dual
Airbags - Front - Knee
Airbags - Front - Side
Airbags - Front - Side Curtain
Airbags - Passenger - Occupant Sensing Deactivation
Airbags - Rear - Side Curtain
Ambient Lighting Color-Adjustable
Assist Handle Front
Assist Handle Rear
Audio - Antenna: Diversity
Audio - Antenna: Mast
Audio - Internet Radio: Spotify
Audio - Premium Brand: Harman-kardon
Audio - Radio: AM/FM
Audio - Radio: HD Radio
Audio - Radio: Touch Screen Display
Audio - Radio Data System
Audio - SiriusXM Satellite Radio
Audio - Speed Sensitive Volume Control
Audio Auxiliary Input: IPod/IPhone Integration
Audio Auxiliary Input: USB
Audio Digital Sound Processing
Audio Streaming: Bluetooth
Audio System 2 Subwoofers
Audio System 14 Speakers
Audio System Surround Audio
Audio Voice Recognition
Auto-Lock
Automatic Hazard Warning Lights
Blind Spot Sensor
Braking Assist
Braking assist hill start assist
Carbon Fiber Black Trim
Cargo Area Light
Center Console Front Console With Armrest And Storage
Center Console Trim Aluminium
Center Console Trim Carbon
Center Console Trim Leather
Child Safety Locks
Child Seat Anchors LATCH System
Clock
Compass
Cornering Brake Control
Cross Traffic Alert Rear
Cruise Control
Crumple Zones Front
Daytime Running Lights LED
Digital Odometer
Door Courtesy Lights
Doors Rear Door Type: Power Liftgate
Doors Rear Door Type: Sensor-activated
Driver Adjustable Suspension: Ride Control
Driver Attention Alert System
Driver Seat Adjustable Lumbar Support: 4-Way Power
Driver Seat Heated
Driver Seat Power Adjustments: 14
Driver Seat Power Adjustments: Recline
Driver Seat Ventilated
Drivetrain 4WD Type: Full Time
Drivetrain Drive Mode Selector
Drivetrain Locking Differential: Rear
Electronic Brakeforce Distribution
Electronic Messaging Assistance With Read Function
Electronic Messaging Assistance With Voice Recognition
Electronic Parking Brake Auto Off
Emergency Braking Preparation
Emergency Interior Trunk Release
Engine Auto Stop/Start
Engine Battery Saver
Engine Exhaust: Performance
Engine Push-Button Start
Exhaust Quad Exhaust Tips
Exhaust Tip Color Black
Extended Merino Leather Upholstery
Exterior Entry Lights Puddle Lamps
Exterior Entry Lights Security Approach Lamps
Exterior Mirrors Driver Side Auto-Dimming
Exterior Mirrors Heated
Exterior Mirrors Integrated Turn Signals
Exterior Mirrors Power
Exterior Mirrors Power Folding
Exterior Mirrors Reverse Gear Tilt
External Temperature Display
Floor Mat Material Carpet
Floor Material Cargo Area Carpet
Floor Material Carpet
Floor Mats Front
Foot Pedal Trim Aluminum
Footwell Lights Color-Adjustable
Front 12V Power Outlet(s)
Front Brakes Ventilated Disc
Front Headrests Power Adjustable
Front Seatbelts: 3-Point
Front Suspension Classification: Independent
Front Suspension Type: Strut
Front Ventilated Seats
Fuel Economy Display MPG
Fuel Economy Display Range
Grille Color Black
Head-Up Display
Headlamp Bezel Color Black
Headlights Auto Delay Off
Headlights Auto On/Off
Headlights Automatic High Beam Dimmer
Headlights LED
Headlights Wiper Activated
Heated Steering Wheel
Impact Sensor Alert System
Impact Sensor Battery Disconnect
Impact Sensor Door Unlock
Impact Sensor Fuel Cut-Off
Impact Sensor Post-Collision Safety System
Inside Rearview Mirror Auto-Dimming
Interior Aluminum Accents
Interior Carbon Fiber Trim
Interior Leather Accents
Lane Deviation Sensors
Lane Keeping Assist
Linked Or Integrated Apps - Information And Entertainment: Google POIs
Linked Or Integrated Apps - Security: Remote Locking
Linked Or Integrated Apps - Security: Remote Locking Horns And Light
Linked Or Integrated Apps - Vehicle Utility: Parked Car Finder
Linked Or Integrated Apps - Vehicle Utility: Service And Maintenance
Linked or Integrated Apps - Information and Entertainment: Google Search
Memorized Settings Includes Audio System
Memorized Settings Includes Climate Control
Memorized Settings Includes Driver Seat
Memorized Settings Includes Exterior Mirrors
Memorized Settings Number Of Drivers: 2
Mirror Color Black
Multi-Function Display
Multi-function Remote Keyless Entry With Panic Alarm
Multi-function Remote Proximity Entry System
Multi-function Remote Trunk Release
Multi-function Remote Vehicle And Key Memory
Navigation System Touch Screen Display
Navigation System With Voice Recognition
Number Of Front Headrests 2
Number Of Rear Headrests 3
One-Touch Windows: 4
Parking Sensors Front
Parking Sensors Rear
Passenger Seat Heated
Passenger Seat Power Adjustments: 14
Passenger Seat Power Adjustments: Recline
Passenger Seat Ventilated
Phone Voice Activated
Phone Wireless Data Link Bluetooth
Power Brakes
Power Steering Speed-Proportional
Power Windows: Remote Operation
Power Windows: With Safety Reverse
Pre-Collision Warning System Audible Warning
Pre-Collision Warning System Visual Warning
Pre-collision Warning System Vibrating Steering Wheel
Premium Brakes
Reading Lights Front
Reading Lights Rear
Real Time Traffic
Rear Brakes Ventilated Disc
Rear Bumper Color Body-Color
Rear Floor Mats
Rear Seats 40-20-40 Split Bench
Rear Seats Split Folding
Rear Spoiler Color Black
Rear Spoiler Lip
Rear View Camera
Rear View Monitor In Dash
Remote Engine Start
Rocker Panel Color Black
Satellite Communications BMW Assist
Seatbelts Emergency Locking Retractors: Front
Seatbelts Emergency Locking Retractors: Front And Rear
Seatbelts Seatbelt Force Limiters: Front
Seatbelts Seatbelt Pretensioners: Front
Seatbelts Seatbelt Pretensioners: Front And Rear
Seatbelts Seatbelt Warning Sensor: Driver And Passenger
Seatbelts Second Row 3-Point
Seats - Driver Seat Power Adjustments: Height
Seats - Passenger Seat Power Adjustments: 4-Way Power Lumbar
Seats - Passenger Seat Power Adjustments: Height
Seats Front Seat Type: Sport Bucket
Seats Perforated Upholstery
Seats Premium Leather Upholstery
Security Anti-Theft Alarm System
Security Anti-Tow Sensor
Security Engine Immobilizer
Security Interior Motion Sensor
Spare Tire Inflator Kit
Spare Tire Tire Sealant Kit
Sport Suspension
Stability Control
Steering Wheel Mounted Controls Audio
Steering Wheel Mounted Controls Cruise Controls
Steering Wheel Mounted Controls Multi-Function Screen Controls
Steering Wheel Mounted Controls Paddle Shifter
Steering Wheel Mounted Controls Phone
Steering Wheel Mounted Controls Voice Recognition Controls
Steering Wheel Tilt And Telescopic
Storage Accessory Hook
Storage Cargo Net
Storage Cargo Tie-Down Anchors And Hooks
Storage Door Pockets
Surround View Camera System
Suspension Active
Suspension Control: Electronic
Suspension Front Arm Type: Lateral Links
Suspension Front Shock Type: Gas Shock Absorbers
Suspension Front Spring Type: Coil Springs
Suspension Rear Coil Springs
Suspension Rear Gas Shock Absorbers
Suspension Stabilizer Bar(s): Front
Suspension Stabilizer Bar(s): Rear
Tachometer
Tail And Brake Lights LED
Taillights Adaptive
Tanzanite Blue II Me
Touch-Sensitive Controls
Traction Control
Traffic Sign Recognition
Trip Odometer
Universal Garage Door Opener Homelink
Vanity Mirrors Dual Illuminating
Vehicle Assistance App - Roadside Assistance
Warnings And Reminders Low Fuel Level
Warnings And Reminders Low Oil Level
Warnings And Reminders Maintenance Reminder
Wifi Capable
Window Trim Black
Windows Front Wipers: Rain Sensing
Windows Front Wipers: Speed Sensitive
Windows Front Wipers: Variable Intermittent
Windows Humidity/Dewpoint Sensors
Windows Lockout Button
Windows Rear Defogger
Wireless Charging Station
Vehicle data is subject to change without notice. The publisher assumes no responsibility for errors and/or omissions in the data and reserves the right to cancel, to terminate or not to process orders where the price or other material information on this site is inaccurate.
Consumer Reviews for the 2026 BMW M3

No reviews found. Be the first to submit a review!

Dealer Information

Dealer

Verona, NJ 07044

 
Reviews for This Dealer

No reviews found. Be the first to submit a review!

About Us  |    Contact Us  |    Terms of Use  |    Privacy Policy  |    Auto Dealer Marketing  |    Site Map

©2026, EveryCarListed.com, LLC All rights reserved.